test(desktop): preserve final 720-test and strict lint acceptance

This commit is contained in:
Codex
2026-09-11 09:25:52 -07:00
parent bef1ea33e4
commit e7491fb00a
9 changed files with 3403 additions and 16 deletions
+3 -4
View File
@@ -10,7 +10,7 @@ The [reboot handoff](REBOOT_HANDOFF_20260911.md) remains the frozen checkpoint.
WSL2 registration, Ubuntu shell and verified offline toolchain setup now pass.
The user's newest VirtioProxy probe still fails; no VPN inspection/change is allowed.
Native Linux numeric26/26 and CLI12/12 passed before deferral. Current Windows
desktop80f2588 passes720/720; later3c9e6ee passes strict Clippy. Finish its full suite, then build
desktop3c9e6ee passes720/720 and strict Clippy. Build
the matching GUI and complete native focus/SA creation verification. Review/fix
the isolated core codec and canvas candidates before integration. Root serializes
all local compilation and native work.
@@ -57,10 +57,9 @@ cross-representation evaluators guide implementation boundaries.
## Immediate execution sequence
1. Finish the fresh full suite for strict-Clippy-passing3c9e6ee after720/720 at80f2588, then stage
the matching Windows GUI for real engineering tasks. Verify the retained SA
1. Stage the matching Windows GUI after3c9e6ee passes720/720 and strict Clippy,
then verify real engineering tasks. Verify the retained SA
State draft, parent focus, creation/history, Reuse, Fragment and final reopen.
Later event-boxing source requires its own regression result.
2. Implement the user-required common canvas interactions for Process and Scenario
in issue2 after the bounded shared-viewport/domain-constraint design decision.
Treat this as direct-manipulation acceptance, not a tool-shelf restyle.