Record updated usability objective and integration evidence

This commit is contained in:
2026-09-10 11:40:45 -07:00
parent b98f135799
commit ee97fcb1e3
5 changed files with 196 additions and 20 deletions
+24
View File
@@ -1,5 +1,29 @@
# Task Ledger — first release
## Updated objective and current strategy — 2026-09-10
Given: the latest authoritative request is
`578cf63e-08b7-411f-a01e-20416441d5e2/goal-objective.md`, copied into
`PROJECT_GOAL.md`. It preserves complete OA/SA, parity, API, traceability,
cross-platform and review requirements, and explicitly emphasizes that current
usability/functionality remains below Capella. The next changes must address
actual engineer workflows; passing narrow technical checks is insufficient.
Verified: palette F2/Save/Undo/Redo and the exact Entity source oracle passed
on candidate 2. Named Actor placement is saved; full basic workflow is pending.
Merged desktop ran 618 tests: 615 passed and 3 failed, with concrete navigation
and history-seed causes now assigned. Schema fixtures and strict reST rendering
passed. Packaging is committed with independent review and exact notice bytes.
See `release-integrated-gates-20260910.md` for scope and failures.
Strategy: finish the actual remaining-height scenario workspace, repair its
navigation and typed-history failures, and make starting a named behavior local
with explicit viewpoint/owner choices. An independent native Capella study
informs that workflow while the creation worker implements its isolated module.
Root integrates and then evaluates realistic current-build tasks. Assumption:
these changes will reduce navigation/draft detours; native acceptance must prove
that. Linux runtime and broader parity/release gates remain unresolved.
**18:10 UTC checkpoint, 2026-09-10:** palette repair candidate 2 passes focused
tests/build/format/strict Clippy and native recovered-draft Escape/save plus the
complete Entity source oracle. The user stopped Computer Use; native verification